一级毛片免费不卡在线视频,国产日批视频免费在线观看,菠萝菠萝蜜在线视频免费视频,欧美日韩亚洲无线码在线观看,久久精品这里精品,国产成人综合手机在线播放,色噜噜狠狠狠综合曰曰曰,琪琪视频

Multi-agentBasedIntegrationofSchedul

時間:2023-05-01 08:23:25 計(jì)算機(jī)論文 我要投稿
  • 相關(guān)推薦

Multi-agentBasedIntegrationofSchedulingAlgorithms

Multi-agent Based Integration of Scheduling Algorithms 注意:本文已在Proceedings of the IASTED International Conference-Intelligent

Systems and Control,2001.11:55-59 發(fā)表,

使用者請注明文章出處

Dr. Bo Zhao, Prof. Dr. Yushun Fan Department of Automation, Tsinghua University Tsinghua Yuan, Beijing 100084 P. R. China ABSTRACT: Up to date more and more research of scheduling use Multi-agent System (MAS) technique. In this paper MAS is used to realize integration of scheduling algorithms. Firstly, Multi-agent Scheduling System (MASS) is divided into two types: Entity-type MASS and Process-type MASS. Some of the researches are introduced. Secondly, the concept of integration of scheduling algorithms is put forward. Thirdly, the models of agents, computing agent and manager, are proposed. Then a Process-type MASS of multi-agent based integration of scheduling algorithms, which compose above two sorts of agents, is built. Finally, we conclude by describing the significance of our research and highlighting future extensions.

KEY WORDS: Scheduling, Multi-agent System, Integration of Scheduling Algorithms, Multi-agent Scheduling System

1. Introduction Algorithm is the key for the scheduling theory. The principle of scheduling is to find an optimal scenario of job allocation or resource distribution with scheduling algorithms. In the past decades many algorithms originated from other fields have been used in scheduling research and therefore formed the so-called scheduling algorithms. These works have enriched scheduling theory. However, any single algorithm that people have used so far are only applicable to a few special environments and can not adapt to dynamic production environment. This makes scheduling algorithms have not exerted all of their power in practical production. It is often the case that the plan formulated by scheduling algorithms is disabled because of some disturbance such as ma

[1] [2] [3] [4] [5]